The Payment Plan Charges task in the Task Scheduler replaces the manual process of generating periodic charges for Regular Payment Plans. To generate the charges using this task, the regular payment plans with monthly payments must be established.
Note: The selection made here will trigger the frequency options at the bottom of the window.
Only One Time: The task will be performed once on the date and time indicated.
Daily: The task will be performed each day as setup in the frequency settings.
Weekly: The task will be performed each day as indicated in the frequency settings.
Monthly: The task will be performed once each month as indicated in the frequency settings.
Note: This option only appears when a frequency interval is selected.
Daily |
The task may be performed every day or on alternate days as specified To perform the task every single day, select the radio button beside Every Day To perform the task on a regular daily interval, select the radio button beside Every x days and choose the specific interval from the dropdown.
For example: To generate charges every 15 days, click the radio button beside Every X days and select 15 from the dropdown. |
Weekly |
The task may be performed one or more times per week on certain days as specified. |
|
Select the number of weeks between the performance of the tasks. Selecting “1” will set the task to be performed each week. Selecting “3” will set the task to be performed every third week. Select the day(s) of the week the task should be performed during the scheduled weeks by placing a check mark beside the desired day(s) of the week. |
|
For example: To generate charges every Monday, select 1 in the Recur Every field and select Monday from the Weeks on field. |
Monthly |
The task may performed on a specific date or day as specified. To perform the task on a specific day of the month, select the radio button beside Day and select the specific date. To manage different month lengths, “Last day of the month” may be selected. To perform the task on a specific day of the week, select the radio button beside The X weekday and set the specific cycle within the month such as 2nd Friday. Select the month(s) the task should be performed during the year by placing a check mark beside the desired month(s). For example: To generate charges on the last Friday of the month, select the radio button beside The and select 4 from the dropdown and Friday from the day dropdown. Click Select All to select all of the months at once. |
Note: This window will not appear if notification is not requested on the previous window.